Welcome to Course on Estimation, Rate Schedule Analysis & BOQ of High-Rise RCC Building using Excel. It is focused on practical application of Estimation using M.S Excel. This course is a field-oriented course and contains real examples and a full fledge 7-Storey real project for better understanding.

After successful completion of this course, you will be able to Estimate a complete RCC Building Project.

Software Use:

  • AutoCAD
  • MS Excel

Duration:

  • Total duration: 1.5 Month
  • Total 10 Class = 5 Weeks x 2 Class per Week x 2 Hours per Class = 20 Total Hours

Requirements for Attending the Course:

  • To have Auto Cad and M.S Excel operating idea.
  • To have the minimum understanding for Civil Quantity/Estimation
  • To have a minimum understanding of construction processes.

Course Outline Details:

PART 01 – BASE & FOUNDATION WORK

1.Land Measurement

2.Earthwork:

  • Earth cutting for foundation
  • Earth filling for foundation
  • Plinth earth filling e.t.c

3.Foundation work:


Pile Work:

  • Boring/Drilling
  • Removing of spoils
  • Reinforced Calculation
  • Reinforced Cement Concrete Work
  • Breaking Head Calculation

Pile Cap Work:

  • Earth work or Sand work
  • Earth Filling or Sand Filling
  • Brick Flat Soling(B.F.S)
  • Cement Concrete work(C.C)
  • Reinforced Calculation
  • Reinforced Cement Concrete work

Shallow Foundation:

  • Strip/Wall Footing
  • Single Footing
  • Combined Footing
  • Mat Foundation

4.Under Ground Water Reservoir

  • Earth work or Sand work
  • Earth Filling or Sand Filling
  • Brick Flat Soling (B.F.S)
  • Cement Concrete work (C.C)
  • Reinforced Calculation
  • Water Stopper Calculation
  • Reinforced Cement Concrete Work


5.Brick Flat Soling

6.Short Column (Below Plinth Level)

  • Reinforced Calculation
  • Formwork
  • Reinforced Cement Concrete Work

7.Grade Beam

  • Reinforced Calculation
  • Formwork
  • Reinforced Cement Concrete Work

PART 02- SUPER STRUCTURE WORK

8.Long Column

  • Reinforced Calculation
  • Formwork
  • Reinforced Cement Concrete Work

9.Floor Beam & Lintel

  • Reinforced Calculation
  • Formwork
  •  Reinforced Cement Concrete work
  • Lintels

10.Stair

  • Reinforced Calculation
  • Formwork
  • Reinforced Cement Concrete work

11.Slab

  • Reinforced Calculation
  • Formwork
  • Reinforced Cement Concrete work

12.Over Head Water Tank

  • Reinforced Calculation
  • Formwork
  • Water Stopper Calculation
  • Reinforced Cement Concrete work

13.Masonry Work/Brick Work

14.Plastering and Pointing

15.Floor Finishing

16.Painting

PART 03-MAKING BILL OF QUANTITY

  • Understanding Bill Of Quantity
  • Making Bill Of Quantity

PART 04- RATE SCHEDULE ANALYSIS

In order to determine the rate of a particular item, the factors affecting the rate of that item are studied carefully and then finally a rate is decided for that item. This process of determining the rates of an item is termed as analysis of rates or rate analysis. 

  • To work out the actual cost of per unit of the items
  • To work out the economical use of materials and processes in completing the particulars item.
  • To work out the cost of extra items which are not provided in the contract bond, but are to be done as per the directions of the department.
  • To revise the schedule of rates due to increase in the cost of material  

Download Course Content from below link

Find us:

📞 Call : 016339057691/01830438534 (For Registration)
Fb page: Design Integrity
Website: dil.com.bd
Blog: blog.dil.com.bd
LinkedIn: linkedin.com/company/dibd

LEAVE A REPLY

Please enter your comment!
Please enter your name here